After-sales Service: | Yes |
---|---|
Type: | Die Casting |
Color: | Customized |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Service | Custom rapid tooling & small-volume production including plastic Injection molding/Die Casting |
Quotation | Quote as per your drawing/design(size, material, feature and structure, processing method, and required technology, etc) |
Tolerance & Surface Roughness | Customize available |
Materials Available | ABS,PC,PEEK,TPE,PA66,etc.(other specified material) ADC12/A380 |
Processing | Injection molding/Die Casting |
Payment method | T/T, wire transfer, Paypal, etc |
Drawing Formats | STP, IGS, Auto CAD, Solid Works, UG, CAD, PDF, etc. |
MOQ | No MOQ requirement for common parts, except for the MOQ of special materials required by the resin supplier. |
One-Stop Service
Hundreds of MUD mold base making to achieve the cost and lead time-saving!
1. Instant quote: Response within 24 hours
2. Cost saving: quote with MUD mold base
3. Quick Turnaround: 7-14 days for mold making after DFM/drawing is confirmed. It depends on the complexity of the Design.
4. No MOQ Requirement, except for the MOQ of special material required by the resin supplier.
5. DFM Analysis: Preliminary DFM provided if needed at the quotation stage. Formal DFM is provided after the order is confirmed.
6.T1/T0 samples were provided to customers for further check after the mold trial.
7. Inspection report: FAI and dimensional report provided if needed.
8. Logistics: we have our own logistic team for the shipment arrangement.
Attention: All parts are custom-made according to the customer's design/ drawings or existing samples. There are no ready parts in stock for sale.
Quality Control at Every Step
3. Equipped with a great deal of advanced injection molding machines, CNC machines, inspection equipment, etc.
4. Choose a suitable processing method for different designs based on the consideration of cost/qty/lead-time/design and so on.
Q5.What are the payment terms of HordRT?
A5.1.Typically, all tooling orders require a 50% deposit in advance, the balance needs to be paid before the T1 sample is shipping.
2. The CNC machining parts require 100% payment before shipment.
3. Unless otherwise agreed, the amount due shall be paid by bank transfer as designated by HordRT
Let us help you provide high-quality parts in a short time.
Get your project started now!